Primary operating owner
Asset Head; Yard/Warehouse; Equipment Operations
P35 · Representative solution case · Logistics / Industrial / Construction
How many asset-hours are lost because equipment cannot be found, trusted or scheduled?
Evidence distinction: this is a representative solution case constructed from the source requirements and Mappls delivery pattern. It is not presented as a named-customer outcome unless a separate verified customer story is explicitly linked.
01 · Operating context
Non-powered and mobile assets are under-utilised, misplaced or maintained reactively because location and state are not visible.
Asset Head; Yard/Warehouse; Equipment Operations
COO; Plant/Project Director
IoT; Maintenance; Security; ERP
Asset loss, rental fleet scale, yard digitisation, capex audit, maintenance backlog, multi-site expansion.
02 · Before and after
Non-powered and mobile assets are under-utilised, misplaced or maintained reactively because location and state are not visible.
Battery/solar trackers, BLE/RFID integration, geofences, utilisation, theft alerts, yard/terminal views, maintenance triggers and APIs.
03 · Stakeholder experience
Asset Head
Yard/Warehouse
Equipment Operations
COO
Plant/Project Director
IoT
Maintenance
Security
Inside Mappls Pro, the same user can hold this role here and a different role in another application. Membership, saved runs and administration remain app-specific.
04 · Day-in-the-life journey
Which asset classes, environments and battery life? What events and ERP/EAM links are required?
Bring the required map, address, road, place, imagery, asset, customer and operational data into a governed Fleet Command workspace.
Live command, Trips, Drivers, Vehicles, Costs give each stakeholder the information, decision and action appropriate to their role.
Track a representative 25-100 asset cohort across yard, transit and job-site workflows.
Operationalise the model through Hardware + per-asset SaaS + installation/integration., adoption governance, service measurement and a managed improvement backlog.
05 · Solution and data architecture
Map, address, place, route, imagery, boundary and context layers
Customer, asset, order, sensor, incident, task or transaction records
Live command · Trips · Drivers · Vehicles · Costs
Location/event reliability, battery/installation feasibility and utilisation improvement accepted.
Battery/portable/asset location and alert devices
Product detailsLive location, trips, geofences, events and playback
Product detailsTracking, trips, alerts, ETA, fleet and control tower
Product detailsField survey, data creation, integration, migration, validation and O&M
Product details06 · Outcome and evidence
Track a representative 25-100 asset cohort across yard, transit and job-site workflows.
07 · Governance and scale
Server-enforced identity, least-privilege app membership, role-specific actions and auditable administration.
Source lineage, quality thresholds, update cadence, retention, consent and controlled data sharing.
Named process owners, exception SLAs, escalation, change control and adoption measurement.
Baseline, intervention and outcome metrics reviewed on an agreed cadence with accountable owners.
Your outcome, powered by Mappls
Bring the baseline, workflow, users, data and success criteria. Mappls will shape a bounded proof and production path.