Primary operating owner
Supply Chain; Logistics; Project/Plant Operations
P47 · Representative solution case · Construction / Cement / Infrastructure
How many tonnes and truck-hours are lost each day to queue, dispatch, routing and detention variability?
Evidence distinction: this is a representative solution case constructed from the source requirements and Mappls delivery pattern. It is not presented as a named-customer outcome unless a separate verified customer story is explicitly linked.
01 · Operating context
High-volume material movements suffer from dispatch delay, truck queues, route risk, turnaround variability and weak delivery evidence.
Supply Chain; Logistics; Project/Plant Operations
COO; Supply Chain Director
TMS; Fleet; Dispatch; Safety
New plant, freight-cost target, dispatch digitisation, transporter tender, safety incident, capacity expansion.
02 · Before and after
High-volume material movements suffer from dispatch delay, truck queues, route risk, turnaround variability and weak delivery evidence.
Order-to-dispatch TMS, truck routing, plant/yard geofences, ETA, FASTag/toll, fleet/video telematics, ePOD and control tower.
03 · Stakeholder experience
Supply Chain
Logistics
Project/Plant Operations
COO
Supply Chain Director
TMS
Fleet
Dispatch
Inside Mappls Pro, the same user can hold this role here and a different role in another application. Membership, saved runs and administration remain app-specific.
04 · Day-in-the-life journey
What dispatch/order/vehicle data and constraints exist? Where are queues and diversions measured?
Bring the required map, address, road, place, imagery, asset, customer and operational data into a governed Material Move workspace.
Request desk, Planning board, Compliance, Driver execution, Verification & cost give each stakeholder the information, decision and action appropriate to their role.
Pilot one plant and representative lanes with live dispatch, ETA, geofences and turnaround dashboard.
Operationalise the model through Per-vehicle/order SaaS + hardware + integration., adoption governance, service measurement and a managed improvement backlog.
05 · Solution and data architecture
Map, address, place, route, imagery, boundary and context layers
Customer, asset, order, sensor, incident, task or transaction records
Request desk · Planning board · Compliance · Driver execution · Verification & cost
Turnaround/ETA visibility accepted; detention/diversion reduce; production integration and economics agreed.
Tracking, trips, alerts, ETA, fleet and control tower
Product detailsCar, truck, two-wheeler, pedestrian and multimodal routes
Product detailsLive location, trips, geofences, events and playback
Product detailsAI video, ADAS/DMS events and evidence
Product details06 · Outcome and evidence
Pilot one plant and representative lanes with live dispatch, ETA, geofences and turnaround dashboard.
07 · Governance and scale
Server-enforced identity, least-privilege app membership, role-specific actions and auditable administration.
Source lineage, quality thresholds, update cadence, retention, consent and controlled data sharing.
Named process owners, exception SLAs, escalation, change control and adoption measurement.
Baseline, intervention and outcome metrics reviewed on an agreed cadence with accountable owners.
Your outcome, powered by Mappls
Bring the baseline, workflow, users, data and success criteria. Mappls will shape a bounded proof and production path.