Primary operating owner
Head Logistics; Transport Planning; Control Tower
P32 · Representative solution case · Logistics / Supply Chain
How much freight spend is locked in empty kilometres, low utilisation and avoidable detention?
Evidence distinction: this is a representative solution case constructed from the source requirements and Mappls delivery pattern. It is not presented as a named-customer outcome unless a separate verified customer story is explicitly linked.
01 · Operating context
Manual planning and disconnected transporter, order and route data inflate kilometres, empty runs, detention and planning effort.
Head Logistics; Transport Planning; Control Tower
COO; Supply Chain Director
TMS Product; ERP/SAP; Fleet Operations
Freight tender, network redesign, cost pressure, new plant/DC, ERP upgrade, control-tower programme.
02 · Before and after
Manual planning and disconnected transporter, order and route data inflate kilometres, empty runs, detention and planning effort.
Load.ai/TMS, order/vehicle matching, route and load optimisation, dispatch, ePOD, freight workflows, ETA and control-tower analytics.
03 · Stakeholder experience
Head Logistics
Transport Planning
Control Tower
COO
Supply Chain Director
TMS Product
ERP/SAP
Fleet Operations
Inside Mappls Pro, the same user can hold this role here and a different role in another application. Membership, saved runs and administration remain app-specific.
04 · Day-in-the-life journey
What orders, vehicle constraints, lanes and cost rules are available? How are plans overridden?
Bring the required map, address, road, place, imagery, asset, customer and operational data into a governed Logistics workspace.
Orders, Planning, Dispatch, Control tower, Proof give each stakeholder the information, decision and action appropriate to their role.
4-6 week lane/depot pilot replaying historical loads and running live shadow dispatch.
Operationalise the model through SaaS per vehicle/order/user + integration/NRE + managed optimisation., adoption governance, service measurement and a managed improvement backlog.
05 · Solution and data architecture
Map, address, place, route, imagery, boundary and context layers
Customer, asset, order, sensor, incident, task or transaction records
Orders · Planning · Dispatch · Control tower · Proof
Savings opportunity validated; planning time reduced; constraint compliance accepted; live integration path agreed.
Order, vehicle, load, route, dispatch, ePOD and freight workflows
Product detailsTag, toll transaction, reconciliation and route cost workflows
Product detailsMarket, territory, network and spatial decision analytics
Product detailsTracking, trips, alerts, ETA, fleet and control tower
Product details06 · Outcome and evidence
4-6 week lane/depot pilot replaying historical loads and running live shadow dispatch.
07 · Governance and scale
Server-enforced identity, least-privilege app membership, role-specific actions and auditable administration.
Source lineage, quality thresholds, update cadence, retention, consent and controlled data sharing.
Named process owners, exception SLAs, escalation, change control and adoption measurement.
Baseline, intervention and outcome metrics reviewed on an agreed cadence with accountable owners.
Your outcome, powered by Mappls
Bring the baseline, workflow, users, data and success criteria. Mappls will shape a bounded proof and production path.