Baseline
Measure current volume, time, cost, failure, service, risk and revenue at the workflow level.
P07 · Implementation blueprint · Mappls Public Safety Command
Manual alarms, fragmented resource databases and non-optimised dispatch slow response and limit preparedness for high-risk premises.
01 · Target operating outcome
Can the nearest appropriate crew see the incident, building risk, access route, hydrants and SOP before arrival?
Business case: reduced turnout/travel time, improved inspection compliance, higher equipment readiness and lower loss exposure.
Measure current volume, time, cost, failure, service, risk and revenue at the workflow level.
Data completeness, route/ETA quality, operator workflow time, inspection use case and integration feasibility accepted.
02 · Solution architecture
GIS risk map, building/fire asset registry, alarm integration, GPS dispatch/routing, hydrant/resource visibility, incident SOPs and analytics. We link prevention, preparedness and response on one spatial system—from inspections and risk maps to dispatch and post-incident analytics.
Map, customer, asset, sensor and enterprise data
Search, routing, GeoAI, rules and spatial models
Incident board · Dispatch · Live units · Response map · After action
reduced turnout/travel time, improved inspection compliance, higher equipment readiness and lower loss exposure.
03 · Users and RBAC
Chief Fire Officer
Municipal Commissioner
Director Fire Services
Home/Urban Secretary
Command Centre Head
CIO
Fleet/Equipment Head
SI
Control-room operator
Dispatcher
The shared Mappls identity is separated from application membership. A user can be an administrator in one app, an analyst in another and a viewer elsewhere.
04 · Data and integration
Map, road, address, place, imagery, boundary and terrain layers appropriate to the decision.
Customer, order, asset, vehicle, incident, task, sensor or transaction records from systems of record.
APIs, SDKs, secure batch, streaming events, webhooks, files or on-premise integration depending on architecture.
Least-privilege RBAC, audit events, encrypted transport, tenant separation and cloud, private or offline deployment.
Places, building-level addresses and location identity
Product detailsCar, truck, two-wheeler, pedestrian and multimodal routes
Product detailsMarket, territory, network and spatial decision analytics
Product detailsBattery/portable/asset location and alert devices
Product details05 · Proof of value
6–8 week zone pilot with asset/risk registry, vehicle tracking and dispatch simulation/live shadow.
06 · Rollout and operating model
Baseline, data, stakeholders, security and architecture
Data connection, role workflows, rules and dashboards
Live users, measurement, change support and decision review
Phased geographies, integrations, service model and continuous improvement