Primary operating owner
Director/Head Distribution; Plant Head; Asset Management/Engineering Head
P12 · Representative solution case · Utilities / Energy / Industry
How much field time and outage duration is caused by not having a trusted, connected asset map?
Evidence distinction: this is a representative solution case constructed from the source requirements and Mappls delivery pattern. It is not presented as a named-customer outcome unless a separate verified customer story is explicitly linked.
01 · Operating context
Asset location, connectivity, drawings and maintenance records are inconsistent, raising outage, safety, planning and field-productivity risk.
Director/Head Distribution; Plant Head; Asset Management/Engineering Head
CMD/MD; Director Technical; Plant/Business CEO
GIS Head; OT/SCADA; CIO; Maintenance; EPC/SI
RDSS/utility reform, asset audit, SCADA/ADMS rollout, plant expansion, safety incident, legacy GIS/EAM replacement.
02 · Before and after
Asset location, connectivity, drawings and maintenance records are inconsistent, raising outage, safety, planning and field-productivity risk.
Survey/base map, network/plant GIS, 2D/3D plans, asset registry, mobile inspection, SCADA/EAM integration, VTS/security layers and analytics.
03 · Stakeholder experience
Director/Head Distribution
Plant Head
Asset Management/Engineering Head
CMD/MD
Director Technical
Plant/Business CEO
GIS Head
OT/SCADA
Inside Mappls Pro, the same user can hold this role here and a different role in another application. Membership, saved runs and administration remain app-specific.
04 · Day-in-the-life journey
Asset/network completeness? Update process? Outage/fault workflow? SCADA/EAM interfaces? Positional accuracy? Field adoption?
Bring the required map, address, road, place, imagery, asset, customer and operational data into a governed Utility Ops workspace.
Network map, Outages, Maintenance, Crews, Planning give each stakeholder the information, decision and action appropriate to their role.
6–10 week feeder/zone pilot: survey/reconciliation, GIS, mobile workflow and one enterprise integration.
Operationalise the model through Data/survey + enterprise licence/subscription + integration + devices where relevant + AMC/managed updates., adoption governance, service measurement and a managed improvement backlog.
05 · Solution and data architecture
Map, address, place, route, imagery, boundary and context layers
Customer, asset, order, sensor, incident, task or transaction records
Network map · Outages · Maintenance · Crews · Planning
Asset completeness/accuracy; update workflow; task-time improvement; integration feasibility; business owner acceptance.
Field survey, data creation, integration, migration, validation and O&M
Product detailsMarket, territory, network and spatial decision analytics
Product detailsPopulation, market, administrative and customer-enriched location layers
Product detailsSurvey, orthomosaic, point cloud, 3D and inspection outputs
Product details06 · Outcome and evidence
6–10 week feeder/zone pilot: survey/reconciliation, GIS, mobile workflow and one enterprise integration.
07 · Governance and scale
Server-enforced identity, least-privilege app membership, role-specific actions and auditable administration.
Source lineage, quality thresholds, update cadence, retention, consent and controlled data sharing.
Named process owners, exception SLAs, escalation, change control and adoption measurement.
Baseline, intervention and outcome metrics reviewed on an agreed cadence with accountable owners.
Your outcome, powered by Mappls
Bring the baseline, workflow, users, data and success criteria. Mappls will shape a bounded proof and production path.